Illustrative data. Every figure below is a stand-in shaped to be internally consistent, with no connection to a live ComEd account or real enrollment data. This is the same convention used in the consumer prototype's Limitations section.

Overview

as of Jul 30, 2026, 14:32 CT

Aggregated flexible capacity

Enrolled EV charging available to shift right now

4,820 kW
▲ 6.4% vs. same time last week

Dispatch status

Current grid event, if any

Active — peak shave

Dispatched 13:00–19:00 CT: high demand forecast, PJM real-time price elevated.

Enrolled devices

EVs under active management

3,140

Dispatch reliability

Most recent event, delivered vs. targeted

94.2 %
▲ 2.1pt vs. prior event

Flexible capacity available (kW)

Hourly, last 7 days — the "virtual battery" size over time

Enrollment & Reach

as of Jul 30, 2026

Invited → activated

Same funnel tracked as a consumer PMF signal — reused here, not a second definition

Enrolled devices, growth

Cumulative, last 12 weeks

Enrollment by ZIP code

Top areas by enrolled devices

Grid Events

as of Jul 30, 2026

Targeted vs. actual load reduction, last 6 events

Forecast accuracy — can ComEd plan around this resource

Targeted Delivered

Consumer Impact

as of Jul 30, 2026

Aggregate savings delivered

Cumulative, all enrolled households

$186,400
▲ $9,200 this week

Average savings per household

Annualized, current enrollment

$59 / yr
Benchmark range from grounding research: $145–$575/EV/yr at full active management — see §A5. Illustrative figure below shows partial-year, partial-optimization pilot data, not the target run-rate.

Retention

Enrolled households still active

96.8 %
▼ 0.4pt vs. last month

Cumulative savings delivered ($)

Last 12 weeks

Compliance & Reporting

as of Jul 30, 2026

Not designed yet — on purpose

This screen would export whatever ComEd's own compliance team actually needs for CRGA and Beneficial Electrification Plan reporting. No specific field list exists anywhere in this project's research, so nothing is mocked up here — that would mean guessing at a regulator-facing report's contents without ComEd's input.

Pending direct input from ComEd